Pipeline Construction

Multi-Line Pipeline Systems

Super Major  |  Fox Creek, AB  |  2017

SCOPE OF WORK: Installation of 2 independent pipeline systems: 56km of NPS 3”-8” of various steel, FlexPipe Linepipe 601 and FlexCord Linepipe 901 pipelines in a common ditch, ranging from 2-5 pipelines in various segments of the ditch, in 16km of ROW.

CHALLENGES/UNIQUENESS: The geographical location, weather, access, and a caribou zone made this project uniquely challenging.

TIME TO COMPLETE: 4 months