Coating

Pipeline Maintenance

Large Pipeline Owner  |  Central Alberta  |  Summer 2015

SCOPE OF WORK: Blasting and Coating

CHALLENGES/UNIQUENESS: The client was experiencing issues with a pipeline sweating and the project location was near an urban community. A 200-kW dehumidification package was utilized in order to alter the air and stop the sweating. This required 100% hoarding in order to proceed with successfully sandblasting and recoating the pipe.

TIME TO COMPLETE: 2 weeks