SCOPE OF WORK: Blasting and Coating
CHALLENGES/UNIQUENESS: The client was experiencing issues with a pipeline sweating and the project location was near an urban community. A 200-kW dehumidification package was utilized in order to alter the air and stop the sweating. This required 100% hoarding in order to proceed with successfully sandblasting and recoating the pipe.
TIME TO COMPLETE: 2 weeks