Pipeline Integrity

Pipeline Replacements

Intermediate Midstream  |  Winnipeg, Manitoba  |  Late Summer – Early Fall 2019

SCOPE OF WORK: Replacement of two segments, 0.5km and 0.6km in length and located in cultivated land, of an NPS 6” pipeline. The tie-in of both replacements to the existing pipeline was completed in an efficient single pipeline shutdown and minimized the duration of the pipeline outage.

CHALLENGES/UNIQUENESS:

TIME TO COMPLETE: 2 months