Pipeline Integrity

Pipeline Replacements

Intermediate Midstream  |  Winnipeg, Manitoba  |  Late Summer – Early Fall 2019

Pipeline Integrity

Watercourse Mitigations

Intermediate Midstream  |  Southern Manitoba (Multiple Locations)  |  2020/2021

Innovations

Retrofitting Sidebooms to Install ROPs (Roll Over Protection)

Arnett & Burgess Energy Services  |  Sedgewick, AB  | 

Innovations

Sideboom with Custom Modifications

Arnett & Burgess Energy Services  |  Sedgewick, AB  |  N/A

Innovations

Dozer to Pipelayer Conversion

Arnett & Burgess Energy Services  |  Sedgewick, AB  | 

Transportation

Labrador Road Construction Mobilization

Large Utility  |  Newfoundland (Goose Bay, NFLD)  |  Summer 2015

Transportation

Equipment and Transportation Readiness

Large Pipeline Owner  |  Alberta  |  Summer 2015

Fabrication

Custom Picker Truck

Oilfield Services Provider  |  Sedgewick Fabrication Shop  |  Early 2020

Fabrication

Meter Skid, Platform & Stairs Fabrication

Large Utility  |  Sedgewick Fabrication Shop  |  Fall 2019

CP & AC Interference Mitigation

AC (Alternating Current) EPC Program

Large Utility/Various Pipeline Owners  |  Central to Northern Alberta  |  2016 - 2019

Coating

Pipeline Maintenance

Large Pipeline Owner  |  Central Alberta  |  Summer 2015

Pipeline Integrity

Launcher/Receiver Installation

Large Pipeline Owner  |  Southeast Alberta (Stettler, Hanna)  |  Spring 2018

Pipeline Integrity

Launcher/Receiver Installation

Large Pipeline Owner  |  Northern Alberta  |  2016 - 2017

Pipeline Integrity

Facility Digs

Large Pipeline Owner  |  Creston, British Columbia  |  Summer 2015

Pipeline Integrity

Emergency Repair

Intermediate Midstream  |  Central Alberta (Sherwood Park, AB)  |  2017

Pipeline Integrity

Emergency Dig

Large Pipeline Owner  |  Northern Alberta (Slave Lake, AB)  |  2013

Pipeline Integrity

Pipeline Abandonment Program

Upstream E&P  |  Southeast Alberta  |  2014

Pipeline Integrity

Pipe in Pipe Repair

International Integrated  |  Northeast Alberta (north of Conklin, AB)  |  Fall/Winter 2015

Pipeline Integrity

Summer Dig Program

Large Pipeline Owner  |  West Central, NE, NW Alberta & NE BC  |  Spring 2014

Facility Construction

Strainer Installation (N40 Strainers)

Large Integrated Midstream Company  |  Central Alberta (Edmonton, AB)  |  Winter 2016 - 2017

Facility Construction

Terminal Repair

Intermediate Midstream  |  South West Saskatchewan (Kerrobert)  |  October 2015 - December 2015

Facility Construction

Meter Station with Hot Tap

Large Pipeline Owner  |  Northwest Alberta (Brazeau Area – Drayton Valley)  |  Late 2015 - Early 2016

Facility Construction

Valve Assembly Upgrades

Large Utility  |  SW Alberta (Cochrane to Morley, AB)  |  Summer 2018

Facility Construction

Pump Station

Large Midstream  |  NW Alberta (Sangudo)  |  2015

Pipeline Construction

Gathering System

Super Major  |  Fox Creek, AB  |  2018/2019

Pipeline Construction

Pipeline, Launchers/Receivers and Pads

Super Major Oil & Gas Producer  |  North Dakota (Watford City, ND)  |  Fall 2019/Early 2020

Pipeline Construction

Pipeline Construction, Environmentally Sensitive

Medium Sized E&P Company  |  NW Alberta (Grande Prairie, AB)  |  Fall 2014

Pipeline Construction

Multiple Lines in a Single Ditch

International Independent  |  North Dakota (Stanley and Tioga, ND areas)  |  Q4 2018, Q3 2019

Pipeline Construction

Winter Pipeline Project

Major Upstream E&P  |  Northwest, Alberta (Brintnell)  |  Winter 2009/2010

Pipeline Construction

Bear Den West

Large Private Midstream Company  |  Watford City, ND  |  2017

Pipeline Construction

Critical Infrastructure Pipeline Replacement via River Crossing

Large Utility  |  Sturgeon River, St. Albert  |  Spring 2018

Pipeline Construction

Concrete Line

Large Mining Company  |  Belle Plaine, Saskatchewan  |  2015

Pipeline Construction

Sour Gas Gathering Pipeline

Small Midstream Company  |  NW Alberta (Wembley, AB)  |  Fall 2018 - Winter 2019

Pipeline Construction

Heavy Wall Long Haul

Start Up Midstream Company  |  Southcentral Saskatchewan  |  2012

Pipeline Construction

Tank Piping and Firewater System within Rail Loading Facility

Large Integrated Midstream Company  |  Central Alberta (Sherwood Park, AB)  |  May 2016 - December 2017

Pipeline Construction

Constraint Program

Large Private Midstream Company  |  North Dakota (Manadaree, ND)  |  Summer 2018 - Winter 2019

Pipeline Construction

Multi-Line Pipeline Systems

Super Major  |  Fox Creek, AB  |  2017

Pipeline Construction

Urban Pipeline

Large Utility  |  SW Calgary  |  2018